Software Engineering MCQ Question Banks With Answers #QB1
Software Engineering MCQ Question Banks With Answers #QB1
#QB1
Download all 4th Semester computer Engineering Group MCQ Question Banks, This article is
aimed to provide MCQ Question banks for 22413 SEN (Software Engineering). As we all know
MSBTE Online examination pattern is totally different it based on Objective Questions(MCQs)
because of this it is difficult to study but we are here for Diploma Students, here on cwipedia
Students can download MCQ question banks, I scheme syllabus, a model answer, and many
more things. (credit: engineeringinterviewquestions)
SEN MCQ QB 2:
SEN MCQ QB 3:
SEN MCQ QB 4:
SEN MCQ QB 5:
a. System software
b. Application software
c. Scientific software
a. True
b. False
ANSWER: True
a. Project planning
b. Scope management
c. Project estimation
a. Functional Requirement.
b. Nonfunctional Requirement.
c. Goals of implementation.
a. Spiral model
b. Big Bang model
c. V-model
d. Waterfall model
a. Software Design
b. Feasibility Study
c. Requirement Gathering
d. System Analysis
10. Which design identifies the software as a system with many components interacting
with each other?
a. Architectural design
b. High-level design
c. Detailed design
d. Both B & C
d. Set of programs
a. Quality management
b. Risk management
c. Performance management
d. Efficiency management
13. If every requirement stated in the Software Requirement Specification (SRS) has only
one interpretation, SRS is said to be correct _____ .
a. Unambiguous
b. Consistent
c. Verifiable
ANSWER: Unambiguous
14. Which is not a step of Requirement Engineering?
a. Requirements elicitation
b. Requirements analysis
c. Requirements design
d. Requirements documentation
16. The level at which the software uses scarce resources is ______ .
a. Reliability
b. Efficiency
c. Portability
ANSWER: Efficiency
17. Modifying the software to match changes in the ever changing environment is called
__________ .
a. Adaptive maintenance
b. Corrective maintenance
c. Perfective maintenance
d. Preventive maintenance
18. If every requirement can be checked by a cost-effective process, then the SRS is
_________ .
a. Verifiable
b. Traceable
c. Modifiable
d. Complete
ANSWER: Verifiable
a. is_a relationship
b. part_of relationship
c. composed_of relationship
d. none of above
a. RE = P/L
b. RE = P + L
c. RE = P*L
d. RE = 2* P *L
ANSWER: RE = P*L
21) Number of clauses used in ISO 9001 to specify quality system requirements are _____ .
a. 15
b. 20
c. 25
d. 28
ANSWER: 20
a. Static view
b. Functional view
c. Dynamic view
b. Software design
c. Testing
a. Unit Testing
b. Beta Testing
c. Stress Testing
d. Mutation Testing
25) If the objects focus on the problem domain, then we are concerned with ______.
27) Which of the following is not a part of the Test Implementation and Execution Phase?
a. Are most useful in uncovering defects in the process flows during real world use of the
system.
b. Are most useful in uncovering defects in the process flows during the testing use of the
system.
c. Are most useful in covering the defects in the process flows during real world use of the
system.
ANSWER: Are most useful in uncovering defects in the process flows during real world use of
the system.
c. Memory leaks.
30) Which plan describes how the skills and experience of the project team members will
be developed ?
a. HR Plan
b. Manager Plan
c. Team Plan
a. Acceptance testing
b. Integration testing
c. System Testing
d. Unit testing
32) The model in which the requirements are implemented by its category is ______ .
b. Waterfall Model
c. Prototyping
35) The tools that support different stages of software development life cycle are called
_______ .
a. CASE Tools
b. CAME tools
c. CAQE tools
d. CARE tools
36) Which defect amplification model is used to illustrate the generation and detection of
errors during the preliminary steps of a software engineering process?
a. Design
b. Detailed design
c. Coding
37) Which method is used for evaluating the expression that passes the function as an
argument?
a. Strict evaluation
b. Recursion
c. Calculus
d. Pure functions
a. Risk avoidance
b. Risk monitoring
c. Risk timing
d. Contingency planning
39) Staff turnover, poor communication with the customer are risks that are extrapolated
from past experience are called _____ .
a. Business risks
b. Predictable risks
c. Project risks
d. Technical risks
40) Organization can have in-house inspection, direct involvement of users and release of
beta version are few of them and it also includes usability, compatibility, user acceptance
etc. is called ______ .
a. Task analysis
d. Testing
ANSWER: Testing
a. Feasibility study
b. Requirement Gathering
43) Software safety is a quality assurance activity that focuses on hazards that may cause
an entire system to fall.
a. True
b. False
ANSWER: True
45) Effective software project management focuses on the four P’s. What are those four
P’s?
a. Quality
b. Efficiency
c. Accuracy
d. Both A and B
e. Both B and C
48) Which testing is the re-execution of some subset of tests that have already been
conducted to ensure the changes that are not propagated?
a. Unit testing
b. Regression testing
c. Integration testing
d. Thread-based testing
3) Divide the project into various smaller parts for ease of management.
a. True
b. False
ANSWER: True
b. Acceptance testing
c. Integrated testing
Happy Learning!